- Essays··7 min read
The Control Room Knew By Noon
India curtailed 8,133 gigawatt-hours of solar power in the second quarter of 2026, roughly 18% of average monthly generation. The forecasting models worked. Transmission infrastructure was not built in time to carry the output. The country's grid AI layer is functioning as designed; the ceiling it optimises below is set by copper, steel, and land-acquisition law.
india-energysolar-curtailmentgrid-infrastructureenergy-transitionRead - Essays··7 min read
The Methane Stack Is Being Built From Orbit Down · The EU Isn't Waiting
One satellite, under two years in orbit, and already 5,000 distinct emission sources flagged. The regulation is already here; the hardware is catching up.
methane-monitoringeu-regulationremote-sensingclimate-accountabilityRead