- Essays··8 min read
Who Gets the Last Hour in a Docomo Battery?
Japan's March 2025 network-safety standards require mobile base stations on peninsulas to hold up to 72 hours of backup power—a floor that reshapes the business case for grid-connected base-station batteries. DOCOMO and NTT's new workload-shifting trial has the right instinct: its outage mode lengthens backup rather than trading it. Any demand-response programme that follows should report, per site, the backup hours remaining before and after each grid event, measured against that site's regulatory floor.
mobile-networksenergy-storagegrid-servicesjapanRead - Essays··11 min read
Sunday Essay · The Delhi Convocation, and What Its Fifty Certificates Cannot Fix
India's mobile networks are mid-transition to AI-managed control loops; the public response has been fifty certificates after a one-month course. The arithmetic does not close. Some 380,000 operational workers need meaningful retraining by 2030, and cohort-based convocations are theatre for the annual report. What will actually work is paid, on-shift reskilling anchored to a live network problem, which is also the pattern that built India's field-engineering workforce in the first place.
india-telecomai-reskillingmobile-networksworkforceRead